Crl Components Inc Part Number CK-104 LONG LEAD with NSN 5910001135499 Is at Your Disposal!

Part Number: CK-104 LONG LEAD
Alternate P/N: CK104LONGLEAD
Manufacturer: Crl Components Inc
NIIN: 001135499
CAGE Code: 71590
FSG: 59 Electrical and Electronic Equipment Components
Country: USA
NCB Code: 00

You have reached this page because of your interest in the Capacitor Fixed Ceramic Dielectr NSN parts we have in stock on Astral Parts. Here, you are provided the opportunity to submit a quote request for Crl Components Inc part number CK-104 LONG LEAD, a component which is readily available for purchase and that can be found by searching for NSN 5910001135499 in our database. Apart from carrying part number CK-104 LONG LEAD, our inventory also features a wide range of others, such as military, defense, and aerospace parts. More than that, we make it our priority to only source from trusted global entities on our Approved Vendor List (AVL).

Note : We Will Not Share Your Information To Any Third Parties.

Product Details

“*” Required Fields Are Compulsory

Contact Information

   * By clicking this box, I acknowledge that I have read and accept the ASAP Semiconductor Terms and Conditions and agree that all quotes and purchase orders are exclusively subject to the ASAP Semiconductor Terms and Conditions.
  • I consent to receive email communications from ASAP Semiconductor and can unsubscribe at any time.
  • ASAP Semiconductor is a wholly independent aftermarket parts distributor.
  • This website is intended for quotations based on part numbers only. Please DO NOT submit drawings, technical data, or other specifications through this portal.

Disclaimer: This is a quotation for the goods listed above. This quotation is meant as an estimate and does not reflect a final bill or invoice. All quotations are subject to change until acceptance by ASAP Semiconductor of a binding Purchase Order, and quotations may be withdrawn or revised at the sole discretion of ASAP Semiconductor. This quotation is subject to the ASAP Semiconductor Terms & Conditions available at https://www.asapsemi.com/customer-terms-and-conditions/ . All United States Government and Department of Defense bids are quoted as CAGE code 6RE77 from ASAP Semiconductor’s Anaheim, California facility. Any quotation from ASAP Semiconductor without 6RE77 is void.

Upload RFQ SHEET

At Astral Parts, we work with numerous government and defense agencies, meaning that we utilize the CAGE Code system to organize our partnerships with various manufacturers, including CAGE Code 71590, under which Crl Components Inc operates. More than that, we take advantage of Federal Supply Classes (FSCs) like FSC 5910 Capacitors, ensuring that you receive the exact item you desire and that will work with your applications. Submit the form below for part number CK-104 LONG LEAD and see how Astral Parts is simplifying the fulfillment process by adhering to a straightforward process that guarantees you get what you need as fast as possible.

NSN Information for Part Number CK-104 LONG LEAD with NSN 5910-00-113-5499, 5910001135499

NSNFSCNIINCLSHazmatDEMILCancelled NSN
5910-00-113-5499

Item PartTypeName:

CAPACITOR,FIXED,CERAMIC DIELECTR

59100011354990PA
CIICHCCESDPMICCriticalityENAC
UAA0
Part NumberISCRNVCRNCCHCCMSDSSADC
300-100-610-104Z31CA

Characteristics Data of NSN 5910-00-113-5499, 5910001135499

MRCCriteriaCharacteristic
AAQLBODY STYLEW/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE
AARGRELIABILITY INDICATORESTABLISHED
AARHRELIABILITY FAILURE RATE LEVEL IN PERCENT0.0010
ABJTTERMINAL LENGTH1.250 INCHES MINIMUM
ADAQBODY LENGTH0.290 INCHES NOMINAL
ADATBODY WIDTH0.290 INCHES NOMINAL
ADAUBODY HEIGHT0.090 INCHES NOMINAL
AEBPCENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH0.200 INCHES NOMINAL
AEBTTERMINAL DIAMETER0.025 INCHES NOMINAL
AEBZSCHEMATIC DIAGRAM DESIGNATORNO COMMON OR GROUNDED ELECTRODE(S)
AGAVEND ITEM IDENTIFICATIONMULTIPLE LAUNCH ROCKET SYSTEM (MLRS)
CQBFINSULATION RESISTANCE AT MAXIMUM OPERATING TEMP10000.0 MEGOHMS
CQBQCAPACITANCE VALUE PER SECTION0.100 MICROFARADS SINGLE SECTION
CQFBVOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE-25.0 TO 15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION
CQJJNONDERATED OPERATING TEMP-55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM
CQWMNONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION100.0 DC SINGLE SECTION
CRTPTOLERANCE RANGE PER SECTION-10.00 TO 10.00 PERCENT SINGLE SECTION
CWJKCASE MATERIALPLASTIC
CWPKINSULATION RESISTANCE AT REFERENCE TEMP100000.0 MEGOHMS
CWPMDISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT2.5000
CWSGTERMINAL SURFACE TREATMENTSOLDER
NHCFNUCLEAR HARDNESS CRITICAL FEATUREHARDENED
TESTTEST DATA DOCUMENT81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS,BROCHURES,ETC.,THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS,INDUSTRY DIRECTORIES,AND SIMILAR TRADE PUBLICATIONS,REFLECTI
TTQYTERMINAL TYPE AND QUANTITY2 UNINSULATED WIRE LEAD
ZZZKSPECIFICATION/STANDARD DATA81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION

Related NSN Components of CK-104 LONG LEAD

Thank You for Visiting.

If You’re Ever Looking for NSN parts Or Have an Aircraft On Ground Situation, Don’t forget That We offer Competitive Pricing and Guaranteed On-Time Delivery.

Request for Quote

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.